• Home
  • Case Studies – YASA

Case Studies – YASA

YASA Motors acquired a complete un-serviced space to relocate to for their new office HQ and production facility for high powered electric motors for automotive and industrial applications. Cube21 Ltd were contracted with the full installation and management of the interior fit out, with a 10 week construction period to the 6750 sqft space. This included their manufacturing & Lab testing department with bespoke work benching bays supplied with 64amp power outlets. Other areas included 20 person open plan office, reception & waiting area, boardroom, x2no executives office and kitchen area. Offices were constructed with a frameless glazed partition system and full height solid veneer doors, corporate manifestation were used on the glazing panels. For the boardroom as double glazed framed module partition system was used to give better acoustic properties. YASA had a specific period which was their only window to complete the move due to their own work and production schedules, so was imperative the dead line was met, to which Cube 21 delivered.

 

© 2015 CUBE21
Site constructed by GD Associates